Phones answered 24/7Plano, TX 75074
Call (855) 974-4733
Phones answered 24/7Call any time(855) 974-4733
Serving Collin County

Pre-Construction Termite Treatment in Plano, TX

Soil treatment applied before concrete is poured on new homes, townhomes and additions in Plano and surrounding Collin County cities.

  • Phones answered 24/7
  • Price explained and approved first
  • Same-day scheduling when a technician is free
  • Termite inspections and WDI reports

Get a fast quote

Fastest: call (855) 974-4733. Or send this and we call you back.

Pre-Construction

Pre-Construction Termite Treatment: what it covers

Quick answer

Pre-construction termite treatment applies a termiticide to the soil, and sometimes to framing, before the slab is poured or the floor is closed in, while the ground is still open. Plano Pest Control connects builders and owners in Collin County with a local technician, and the price and timing are explained before work.

Pre-Construction Termite Treatment illustration for Plano, TX, with the Plano water tower and a creek in the background

After the concrete is placed, the soil under a slab is out of reach. Treating it later means drilling through the floor or working from the edges, and neither reaches every spot. Treating before the pour is the one time a technician can put product directly on bare soil under the whole footprint, around plumbing stub-outs and along the edges of the foundation.

In and around Plano, new work includes townhomes, infill houses, additions and mixed-use buildings in areas like Legacy West, Frisco and Allen. The schedule on a building site changes day by day, so the call line Plano Pest Control answers phones 24/7 and schedules visits the same day when a technician is free. Same-day service is not promised, and timing around a concrete pour is something to raise at the first call. For an existing house, see termite control instead.

Service area
Plano & Collin County
Availability
Phones answered 24/7
Warning signs

Signs you need pre-construction termite treatment

Keep people and pets off a freshly treated pad until the technician says it is dry and the concrete is placed. Do not move or rake treated soil, and do not wash it before the pour.

  • A foundation is being prepared and the forms or plumbing rough-in are set but the concrete is not yet poured
  • You are building a new home, a townhome or an addition on a lot with soil still exposed
  • A builder asks which treatment is planned and who handles the paperwork
  • A lender or buyer asks about a termite pre-treatment record for a new house
  • Landscape timbers or railroad ties are stacked on or near the building pad
  • Fill dirt has been added or soil disturbed after an earlier treatment
  • Heavy rain has washed over the pad before the vapor barrier or pour
  • An addition is being tied into an existing slab, with new footings next to treated or untreated soil
Our process

How our pre-construction termite treatment visit works

  1. Schedule around the pour

    The technician needs to know the pad prep, plumbing and pour dates. Treatment goes on after grading and plumbing rough-in and before the vapor barrier and concrete.

  2. Site check

    The technician looks at the soil, the plumbing stub-outs, the edges of forms, any fill, and wood debris or form boards left in the ground, which termites can use as food.

  3. Price and method explained

    You are told how much of the pad will be treated, which labeled product is planned and what the price is. The price is explained and approved before treatment is done.

  4. Soil application

    A labeled termiticide is applied to the soil under the slab area, along the foundation edges and around penetrations, following the product label's rates and conditions.

  5. Protect the treated soil

    The treated pad should be covered promptly with the vapor barrier and concrete. If rain falls or soil is disturbed after treatment, the technician should be told, since re-treatment may be needed.

Why treat the soil before the slab is poured?

Before the pour, the technician can reach bare soil across the whole footprint and around plumbing stub-outs. After the concrete is placed, that soil is hidden and any later treatment has to work from the edges or through drilled holes, which makes complete coverage harder.

Termites find small gaps. A hairline crack in a slab, a plumbing penetration or an expansion joint can be enough, and treated soil under the pad is one layer of protection that complements later inspections.

It is not a lifetime shield. Product breaks down over time, soil moves and landscaping changes the conditions, so an inspection plan after move-in is still useful. A termite inspection is the follow-up step.

For townhomes and mixed-use buildings, it also helps to coordinate treatment with the sequence of trades. Plumbers, electricians and grading crews all disturb soil, and a treatment applied before that work is done may need to be repeated.

Does Blackland clay change how a new slab is treated?

Blackland Prairie clay can shrink and swell a great deal, and slabs built on it are designed for that movement. A technician treats the soil the same way, but clay movement can later open cracks and gaps, so the exterior edge and penetrations deserve ongoing attention.

Soil surveys describe the clay as having very high shrink-swell potential, which is one reason builders in North Texas use engineered foundations. Termite treatment does not change the foundation design, and the foundation design does not stop termites from using a crack.

The Blackland clay and termites guide covers this in more detail. Ask your builder whether the slab is post-tensioned or conventionally reinforced, since that affects where drilling is safe later.

What should a builder or owner ask about the treatment?

Ask which product is planned, when it will be applied relative to the pour, who keeps the treatment record, what happens if rain or soil disturbance follows, and what follow-up inspection is suggested. Ask also for the license number of the company doing the work.

Texas pest control businesses must hold a Structural Pest Control Service business license from the Texas Department of Agriculture, and any company you consider should be willing to give its number on request. Keep the treatment paperwork with the closing documents for the house.

If a general contractor arranges the treatment, ask for the company name and the date so you can follow up.

Ask also whether the treatment record will list the product, the area covered and the date. A record that is specific is far more useful to a lender or a later technician than a one-line invoice.

How much does pre-construction treatment cost?

The price depends on the size of the foundation, the number of slabs or buildings, the product and method, the schedule and whether a second perimeter treatment is planned. A technician explains the price and approvals before the soil is treated, and quotes are usually site-specific.

No fixed figures are published here, because the price depends on the footprint and the job. For a townhome row or a multi-building site, ask whether there is a per-building or per-site price, and whether re-treatment after weather is included.

Builders often compare quotes, and it helps to give each company the same plans and dates so the numbers can be compared fairly.

What can go wrong between treatment and pour?

Heavy rain, soil disturbance, added fill, plumbing changes or a long delay before the pour can compromise the treated layer. Tell the technician about any of these so the area can be re-treated before concrete is placed.

  • Rain after application and before the vapor barrier
  • Fill dirt or gravel added over the treated soil
  • Plumbing or utility trenches cut after treatment
  • Wood form boards, stakes or debris left in the soil
  • A long delay between treatment and the pour
Options

Types and options for pre-construction termite treatment

Soil treatment before the slab

The most common approach on slab-on-grade construction. The technician applies a liquid termiticide to the soil before the vapor barrier goes down, aiming for an even treated layer under the whole footprint.

Perimeter and penetration treatment after backfill

After the slab is poured and backfilled, the exterior perimeter and any area where plumbing or utilities pass through can get a second treatment. This helps in spots where the first application may have been disturbed.

Wood treatment or monitoring added later

Some builders choose treated framing lumber, or plan a bait or monitoring system after move-in. Bait stations are described on the termite bait systems page.

Collin County

Why pre-construction termite treatment is different in North Texas

Plano and nearby cities have a steady stream of new and infill construction: townhomes and apartments near Legacy West, houses in Frisco and Allen, and redevelopment on older lots elsewhere. Each site has its own schedule, so the call line should be told which stage the pad is at.

Spring is the active storm season in North Texas, and hail and heavy rain have been reported in Plano and Frisco. A rain-soaked pad can delay a pour, and treated soil that gets washed or disturbed may need to be treated again, so keep the technician in the loop.

Old railroad ties used as landscape borders or retaining walls are thought to be one way Formosan termites reached the Dallas-Fort Worth area, and Formosans have been found in a Wylie neighborhood. Do not reuse old timbers on or near a new build.

Need pre-construction termite treatment today?

Call any hour and explain what is going on. You get a clear price before any work starts.

Related

Termite Control

Subterranean termite treatment for slab homes in Plano and Collin County, with the method and price explained before work starts.

Termite Bait Systems

In-ground monitoring and bait stations around the house, a fit for some lots where patios and landscaping crowd the slab.

Termite Inspection

A look at slab edges, plumbing gaps, garages and wood near soil to see whether termites are present, before they are a surprise.

WDI Report for a Home Sale

A wood-destroying insect report for sellers, buyers and lenders in Plano, with findings explained in plain language.

Guides

Read before you book

FAQ

Pre-Construction Termite Treatment FAQs

When exactly is the treatment applied?

After grading and plumbing rough-in and before the vapor barrier and concrete. The technician needs the pour date in advance to schedule properly.

Does a pre-treated slab need termite inspections later?

Yes, a periodic inspection is still a good idea. Products wear down, soil shifts and new landscaping can change conditions near the foundation.

Who gets the treatment record?

Ask when you book. The record may go to the builder, and an owner should request a copy for their files because lenders or future buyers sometimes ask for it.

Can I treat an addition's footing this way?

Often yes, if the soil is open. Tell the technician which edge of the existing slab the addition joins and whether any exterior treatment already exists.

What if it rains after the treatment?

Tell the technician. Depending on the product and rainfall, re-treatment may be needed before the pour.

Is pre-treatment right for pier-and-beam or a crawl space?

Different foundations call for different methods, such as treating the soil and the sill area, and the technician can explain. Slab-on-grade is the most common case discussed on this page.

Can an owner arrange this directly, or does the builder?

Either, depending on the contract. Owners building a custom home or an addition can usually ask a technician directly, while buyers of a production home should ask the builder who is responsible.

Find Plano Pest Control on